The crew hard at it.
The foundation seems a lot different (cleaner look) once the forms were removed, but still looks pretty daunting standing behind the eight foot wall of concrete at the back.
Good shot of the 3-car garage. The bay on the front is the future home of the El Camino.
We'll be back in a couple of weeks to set locations for electrical outlets, phone jacks, speaker and other wiring. With a little luck, the plywood will also be down on the roof.
No comments:
Post a Comment