Our daughter-in-law Nina graduated from Texas State on Friday, August 13, 2010 (Yay Nina!). Kelly and Ron both had work conflicts, but Winnie was able to attend and represent us. Winnie took the opportunity to go out to the property and check on the status. As you can see from this picture, framing is well underway.
The crew hard at it.
The foundation seems a lot different (cleaner look) once the forms were removed, but still looks pretty daunting standing behind the eight foot wall of concrete at the back.
Good shot of the 3-car garage. The bay on the front is the future home of the El Camino.
We'll be back in a couple of weeks to set locations for electrical outlets, phone jacks, speaker and other wiring. With a little luck, the plywood will also be down on the roof.
No comments:
Post a Comment